To view an item's pending bill of materials (BOM) changes, go to
. The following screen will appear:When displaying an item's pending BOM changes, you are presented with the following options:
Enter the item number of the manufactured item whose pending BOM changes you want to view.
Inventory unit of measure.
If revision control is enabled at your site, specify the BOM revision number you want to view. If none exists, simply enter a value to create one. The status of the revision will also be displayed. The following statuses apply to revisions:
This is the current, default revision used for costing and material requirements planning (MRP). Only one revision can be active at the same time. Active revisions may be modified. However, once a revision becomes inactive, it may no longer be changed.
Indicates the last event date to display.
Display lists pending BOM changes, using the specified parameters.